Virginia's Trusted Shed Dealer
Shed Permit Guide: Chesterfield County
Everything you need to know about shed permits, setbacks, and zoning in Chesterfield County, Virginia. We handle the permit process so you don’t have to.
Do You Need a Permit for Your Shed?
The short answer: probably not.
Under the Virginia Uniform Statewide Building Code (USBC), detached accessory structures (like sheds) that are 256 square feet or smaller and single-story are generally exempt from building permits.
However, Chesterfield County is unique: you still need a zoning permit (~$50) for ALL accessory structures β even small sheds. The sections below break down exactly what you need.
Chesterfield Permit Thresholds
β€256 sq ft
No building permit needed. Single-story, no utilities. Zoning permit still required (~$50).
>256 sq ft
Building permit required (~$80+). Zoning permit also required. Submit plans and site layout to Chesterfield Building Inspection.
With Utilities
Electric (50V+), plumbing, or HVAC each require separate trade permits β even on sheds under 256 sq ft.
Side Yard
5 ft minimum
Minimum 5-foot setback from side property lines. Applies to all accessory structures regardless of size.
Rear Yard
5 ft minimum
Minimum 5-foot setback from rear property line. Shed must also be outside any drainage or utility easements.
Front Yard
Behind building line
Sheds must be behind the front building line β no accessory structures allowed in the front yard.
Max Height
15 feet
Accessory structures limited to 15 feet. Must remain subordinate to the principal dwelling.
Important: “Permit-exempt” doesn’t mean “regulation-free.” Chesterfield requires a zoning permit for ALL accessory structures, regardless of size. Total lot coverage (house + driveway + shed + patio) must stay within zoning district limits.
Chesterfield Building Inspection
9800 Government Center Parkway, Chesterfield, VA 23832
Phone: (804) 748-1057
MondayβFriday, 8:00 AM β 5:00 PM
Online Portal: aca-prod.accela.com/CHESTERFIELD
What to submit: Completed zoning permit application, site plan showing shed location and distances to all property lines, shed specifications (footprint, height, materials). For building permits: construction plans and structural details.
Utility Trigger Rules
- ✓ Electrical: Wiring at 50 volts or more requires an electrical permit
- ✓ Plumbing: Any water supply or drainage connection requires a plumbing permit
- ✓ HVAC/Mechanical: Heating or cooling installation requires a mechanical permit
- ✓ Low-voltage (under 50V) is generally exempt
Adding utilities to a shed β€256 sq ft does not trigger a building permit for the structure itself β but the utility work needs its own trade permit.
Important Notes
- ✓ Easements: Sheds cannot be placed within drainage, utility, or other easements
- ✓ Lot coverage: Total impervious coverage must stay within zoning district limits
- ✓ Concrete slabs may require a separate permit
- ✓ HOA rules: Many Chesterfield neighborhoods have separate HOA requirements
- ✓ Foundation: Structures must be anchored against wind uplift per manufacturer specs
Frequently Asked Questions
Q: What size shed can I build without a permit in Chesterfield?
Sheds 256 square feet or smaller that are single-story and don’t have utilities are exempt from building permits. You still need a zoning permit (~$50) β Chesterfield requires one for all accessory structures.
Q: How much does a shed permit cost in Chesterfield?
A zoning permit is approximately $50. If your shed is over 256 sq ft, a building permit starts around $80+ depending on scope.
Q: How far from my property line does my shed need to be?
Minimum 5-foot setback from both side and rear property lines. Must be behind the front building line and outside any easements.
Q: Can I put a shed in my front yard?
No. Accessory structures must be behind the front building line β typically in the rear or side yard.
Q: Do I need HOA approval for a shed in Chesterfield?
Many Chesterfield neighborhoods have HOAs with their own rules. Always check with your HOA first β their requirements are separate from county permits.
Q: Does Evergreen Sheds handle the permit process?
Yes! We guide Chesterfield homeowners through every step. Call us at (804) 410-5052 or get a free quote.
Sources & Last Verified
Last verified: March 4, 2026
- Virginia USBC, Section 102.3 β Permit Exemptions
- Chesterfield County Zoning Ordinance
- Chesterfield Building Inspection: chesterfield.gov/223
- Requirements for Sheds, Carports and Garages (PDF)
Ordinances can change. Always confirm current requirements with Chesterfield’s Building Inspection department.
Ready to Get Started?
Design your perfect shed β pick your size, style, and add-ons, and get a quote in minutes. We deliver and install across Chesterfield County.